Skip to content
SolsticeElectric Co. · Raleigh

The upgrade that unlocks everything else.

Solar, batteries, EV chargers and heat pumps all land on the same service panel. If it is a 100 amp board from 1978, that is the project, and everything else waits behind it.

Get a quote

Free site visit, written proposal.

$2,900

Typical 100A to 200A service upgrade including permit and utility coordination.

What the job covers

  • Existing service capacity measured, not estimated
  • Utility coordination and disconnect scheduled
  • New panel, main breaker and grounding to current code
  • Circuits transferred and labelled properly
  • Permit and inspection included
  • Written capacity headroom report for future loads

Payback

Required first

Every figure on this site is an estimate from Triangle averages with its assumptions published. Your real number comes from a site visit.

An open residential electrical service panel showing neat rows of breakers and dressed conductors.

Federal Pacific and Zinsco

If your Triangle home was built between the 1950s and the early 1980s, there is a real chance the panel is a Federal Pacific Stab-Lok or a Zinsco. Both have documented histories of breakers that fail to trip.

We will tell you what you have and what the evidence actually says, without theatrics. It is a real safety issue and it is also a favourite scare tactic, and you deserve the version without the sales pressure.

Find out what your roof is actually worth.

Book an estimate(919) 555-0163