A Level 2 charger, installed to code, in one day.
Most homes need a dedicated 240 volt circuit and sometimes a panel upgrade. We check your panel capacity before we quote, so the price you get is the price you pay.
$1,450
Typical installed cost where existing panel capacity is sufficient.
What the job covers
- Panel capacity load calculation
- Dedicated 240V circuit run
- Permit and city inspection
- Charger mounted and commissioned
- Surge protection checked
- Written as-built diagram
Payback
3.1 yr payback
Every figure on this site is an estimate from Triangle averages with its assumptions published. Your real number comes from a site visit.

Why panel capacity decides the price
A Level 2 charger draws more than almost anything else in a house. If your panel is already near its limit, the charger is the cheap part and the service upgrade is the real cost.
We check that first, on the first visit, so nobody discovers it halfway through an install. Roughly one Triangle home in four needs the upgrade.